Sulekha Rani.R, P.G.T Chemistry , KV NTPC Kayamkulam
PSLV
The Polar Satellite Launch Vehicle,usually known by its abbreviation PSLV is the first operational launch vehicle of ISRO. PSLV is capable of launching 1600 kg satellites in 620 km sun-synchronous polar orbit and 1050 kg satellite in geo-synchronous transfer orbit. In the standard configuration, it measures 44.4 m tall, with a lift off weight of 295 tonnes. PSLV has four stages using solid and liquid propulsion systems alternately. The first stage is one of the largest solid propellant boosters in the world and carries 139 tonnes of propellant. A cluster of six strap-ons attached to the first stage motor, four of which are ignited on the ground and two are air-lit.
The reliability rate of PSLV has been superb. There had been 17 continuously successful flights of PSLV, till April 2011. With its variant configurations, PSLV has proved its multi-payload, multi-mission capability in a single launch and its geosynchronous launch capability. In the recent Chandrayaan-mission, another variant of PSLV with an extended version of strap-on motors, PSOM-XL, the payload haul was enhanced to 1750 kg in 620 km SSPO. PSLV has rightfully earned the status of workhorse launch vehicle of ISRO.
Typical Parameters of PSLV | |
Lift-off weight | 295 tonne |
Pay Load | 1600 kg in to 620 km Polar Orbit, 1060 kg in to Geosynchronous Transfer Orbit (GTO) |
Height | 44 metre |
PSLV Milestones | ||||||||||||||||||||||||||||||||||||||
|
GSLV
Geosynchronous Satellite Launch Vehicle(GSLV)-Mark I&II ,is capable of placing INSAT–II class of satellites (2000 – 2,500 kg) into Geosynchronous Transfer Orbit (GTO). GSLV is a three stage vehicle GSLV is 49 m tall, with 414 t lift off weight. It has a maximum diameter of 3.4 m at the payload fairing. First stage comprises S125 solid booster with four liquid (L40) strap-ons. Second stage (GS2) is liquid engine and the third stage (GS3) is a cryo stage. The vehicle develops a lift off thrust of 6573 kn. The first flight of GSLV took place from SHAR on April 18, 2001 by launching 1540 kg GSAT-1. It was followed by six more launches , GSLV-D2 on May 8, 2003 (GSAT-2 1825 kg), GSLV-F01 on September 20, 2004 (EDUSAT 1950 kg), GSLV-F02 on July 10, 2006, GSLV-F04 on September 2, 2007 (INSAT-4CR 2130 kg), GSLV-D3 on April 15, 2010 and GSLV-F06 on December 25, 2010.
|
No comments:
Post a Comment